India-Pak relations: Indus Waters Treaty #50

Oracle IAS, the best coaching institute for UPSC/IAS/PCS preparation in Dehradun (Uttarakhand), brings to you views on important issues.

'The Indus water treaty has stood the test of times, however with geopolitical and environmental  changes the treaty should be renegotiated.' Discuss. 

Syllabus: GS-2 – International relations

In News: India and Pakistan are holding crucial talks over various aspects of the Indus Waters Treaty. This is the first engagement between the two nations since Pakistan Prime Minister Imran Khan took office.

Indus Waters Treaty (IWT) – Signed by India and Pakistan in 1960 and brokered by the World Bank

Under the treaty, India has full use of the three “eastern” rivers (Beas, Ravi, Sutlej), while Pakistan has control over the three “western” rivers (Indus, Chenab, Jhelum), although India is given rights to use these partially as well for certain purposes like limited irrigation, power generation etc.

  • [] The biggest sticking point in negotiating the treaty in the 1950s was the conditions under which India could use the hydro-electric potential of the Chenab and the Jhelum before the rivers reached Pakistan.
  • [] The principle incorporated into the IWT was that, indeed, India could develop this potential, but only under a set of well-defined limitations on the amount of manipulable storage which could be created by India in the process, thus assuring Pakistan that India would not have the ability to manipulate either the timing or the quantities of the flows reaching Pakistan.

# 1990s: A difference arose about the Baglihar Dam being built by India on the Chenab. Pakistan claimed that low gates installed for flushing sediments violated the specifications of the treaty and endangered Pakistan’s water security because it gave India a capacity to manipulate the timing of flows into Pakistan.

# 2010: Pakistan took a new case, that of the Kishenganga hydro-electric project on the Jhelum river, to the International Court of Arbitration. On December 20, 2013, the court issued its final judgment which comprised of two elements —

  • [] Was India within its rights to build the project and was India able to insert low gates – India was allowed to proceed.
  • [] While it might be convenient for India to build low gates and practise sediment flushing, this was not the only way to manage sediments, and that convenience for India had to be balanced against the threat this would pose to Pakistan’s water security.
  • [] Mandated a small, constant release which was less than 10% of what Pakistan claimed to be necessary – representing an appropriate balance between the needs of the environment and India’s right to power generation.

Challenges & Solutions:

Climate change-induced glacier melting in the Himalayas threatens future water supply in the Indus basin. There is increasing global warming, but the rise in temperature in the Himalayas has been much higher than the global average. Thus, harnessing the Indus river system sustainably is a crucial issue for improving human development and contributing to regional peace and security in South Asia.

While India and Pakistan remain the largest stakeholders due to the size and volume of the waters and vis-à-vis their usage, Afghanistan (a small area due to Kabul river) and China – as Indus and Sutlej originate in Tibet – too are part of the basin. The river system in the basin includes: Ravi, Beas, Sutlej, Swat, Chitral, Gilgit, Hunza, Shigar, Shyok, Indus, Shingo, Astor, Jhelum, Chenab and Kabul.

The Indus Basin epitomises a grand challenge due to its high poverty rates, high groundwater extraction, increased environmental degradation and risk of floods and droughts due to climate change.

  • [] There is a need for integrated development of the basin as there are possibilities of building more storage facilities across the Indus and its tributaries to ensure better use of the scarce water. Water projects can be situated at optimum locations, notwithstanding geographic divisions along political lines.
  • [] For appropriate and competent management of Indus systems, it is necessary to explore establishing an effective and independent river basin organisation, involving all the four riparian sates, which will have the capability of taking decisions on its own and remain out of the political control of any national government.
  • [] The treaty could be renegotiated where India could be allowed to harness the potential of the rivers and at the same time supply electricity to Pakistan at very nominal rates.

Conclusion:

India needs to take the opportunity to work for a comprehensive and integrated form of basin management, the benefit sharing of the Indus river system will not be limited only to water resources; it can have other peace-enhancing effects and significantly contribute to regional peace, security and development.

Hemant Bhatt

Leave a Comment

Home
UKPCS-24
UPPCS
UPSC